
Home > Terms > Arnavutça (SQ) > vlera e fituar
vlera e fituar
The value of completed work expressed in terms of the approved budget assigned to that work for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work performed.
- Cümlenin Öğesi: isim
- Eş Anlamlı Sözcük(ler)
- Sözcük Blogu
- Sektör/Rtki Alanı İşletme hizmetleri
- Kategori Proje yönetimi
- Company: WSDOT
- Ürün
- Kısaltma:
Diğer Diller:
Ne demek istiyorsunuz?
Terimler Haberlerde
Öne Çıkan Terimler
phylum placozoa
Macroscopic, flattened marine animals, composed of ventral and dorsal epithelial layers enclosing ...
phylum cnidaria
Cnidarians. Hydras, hydroids, jellyfish, sea anemones, and corals. Free-swimming or sessile, with ...
share a term with millions
Share a term with millions of users around the world and increase your online visibility.Share a ...
oak
Genus native to the Northern Hemisphere with spirally arranged leaves, catkins for flowers and ...
Everest
The last but not least mount Everest. The Earth's highest mountain, with a peak at 8,848 metres ...
aglaonema
Genus of about 20 species of usually rhizomatous, evergreen perennials from tropical forest in Asia. ...
Robojelly
Robojelly is a hydrogen-powered robot desgined in the United States that moves through the water ...
Ferdinand Porsche
Ferdinand Porsche (3 September 1875 – 30 January 1951) was an Austrian-German automotive engineer ...
Marzieh Afkham
Marzieh Afkham, who is the country’s first foreign ministry spokeswoman, will head a mission in east ...
Katılımcı
Öne çıkan sözlükler
Browers Terms By Category
- Body language(129)
- Kurumsal iletişim(66)
- Sözlü iletişim(29)
- Teknik yazı(13)
- Posta iletişimi(8)
- Yazılı iletişim(6)
İletişim(251) Terms
- Saat(712)
- Takvim(26)
Kronometri(738) Terms
- Biyokimya(4818)
- Moleküler biyoloji(4701)
- Microbiology(1476)
- Ekoloji(1425)
- Toksikoloji(1415)
- Hücre biyolojisi(1236)
Biyoloji(22133) Terms
- Plastic injection molding(392)
- Industrial manufacturing(279)
- Kağıt üretimi(220)
- Fiberglas(171)
- Contract manufacturing(108)
- Cam(45)
Üretim(1257) Terms
- Radyoloji ekipmanları(1356)
- OBGYN ekipmanları(397)
- Kalp malzemeleri(297)
- Klinik çalışmalar(199)
- Ultrasonik ve optik ekipmanlar(61)
- Fizik tedavi ekipmanları(42)