- Sektör: Oil & gas
- Number of terms: 9502
- Number of blossaries: 0
- Company Profile:
George King is a technology provider in the oil and gas industry specializing in new technology and problem oil well solutions.
A completion that uses a screen without a gravel pack, allowing the formation to cave in around the screen.
Industry:Oil & gas
A completion that uses flow to purposely increase the size of the open hole wellbore.
Industry:Oil & gas
A completion where CT and associated CT-mounted hardware is used as the primary completion flow path.
Industry:Oil & gas
A completion where the well is cased and cemented and then perforated in the zone of interest.
Industry:Oil & gas
A completion with casing set through the interval and cemented.
Industry:Oil & gas
A completion with no packer. Common where ever gas has to be kept away from ESPs and rod rumps.
Industry:Oil & gas
A completion with the casing set and cemented above the pay. Usually an open hole pay zone.
Industry:Oil & gas
A complex force governing some fluid movements, especially in smaller pores. Capillary action is the result of adhesion and surface tension forces. Adhesion (or attraction) by a fluid to the walls of a pore creates an attracting (or repelling) force, which along with surface tension and cohesion, keep the fluid together. Thus in a capillary or small pore, the level of the fluid may be above or below the surrounding level in larger pores. This helps explain water blocks.
Industry:Oil & gas
A complex non-Newtonian fluid without thixotrophy. Flow starts with pressure but apparent viscosity decreases instantaneously with increasing rate of shear.
Industry:Oil & gas
A complex, non-Newtonian fluid whose shear force is not proportional to the shear rate. Pressure is necessary to start circulation of the static fluid. Main low rate flow is plug flow. Yield point is greater than zero.
Industry:Oil & gas